Refine Your Search

Topic

Author

Search Results

Technical Paper

Selection of an Alternate Biocide for the International Space Station Internal Active Thermal Control System Coolant Loops

2003-07-07
2003-01-2568
The International Space Station (ISS) IATCS (Internal Active Thermal Control System) includes two internal coolant loops that use an aqueous based coolant for heat transfer. A silver salt biocide was used initially as an additive in the coolant formulation to control the growth and proliferation of microorganisms in the coolant loops. Ground-based and in-flight testing has demonstrated that the silver salt is rapidly depleted and not effective as a long-term biocide. Efforts are now underway to select an alternate biocide for the IATCS coolant loop with greatly improved performance. An extensive evaluation of biocides was conducted to select several candidates for test trials.
Technical Paper

One Pass Drilling of Precision Holes in Aircraft Structures

2002-09-30
2002-01-2639
This paper will discuss various drill process techniques developed and implemented at the Boeing facility in St. Louis for producing precision fastener holes in a variety of aircraft materials with a single drill pass operation. In other words, we are not drilling a pilot hole before the drill pass or taking a final ream pass after the drill pass. The benefits include cycle time savings, perishable tool savings, and an improvement in the quality of the holes. The types of drilling processes that will be discussed include power feed drilling using portable power tools. Aspects of the drilling process that will be discussed include cutting tools, coolants, equipment, tooling / drill plates and vacuum collection.
Technical Paper

Assessment of Lithium Hydroxide Conservation Via International Space Station Control of Orbiter Carbon Dioxide

2002-07-15
2002-01-2271
In order to conserve mass and volume, it was proposed that the International Space Station (ISS) control the level of carbon dioxide (CO2) in the Space Shuttle Orbiter while the Orbiter is docked to the ISS. If successful, this would greatly reduce the number of lithium hydroxide (LiOH) canisters required for each ISS-related Orbiter mission. Because of the impact on the Orbiter Environmental Control and Life Support Subsystem (ECLSS), as well as on the Orbiter flight manifest, a Space Shuttle Program (SSP) analysis was necessary. STS-108 (ISS UF1) pre-flight analysis using the Personal Computer Thermal Analyzer Program (PCTAP) predicted that the ISS would be able to control the level of CO2 in the Orbiter (and throughout the stack) under nominal conditions with no supplemental LiOH required. This analysis assumed that the Carbon Dioxide Removal Assembly (CDRA) located in the U.S.
Technical Paper

International Space Station (ISS) United States Carbon Dioxide Removal Assembly Blower Anomaly Resolution

2001-07-09
2001-01-2416
The Carbon Dioxide Removal Assembly (CDRA) is the primary carbon dioxide removal system located in the United States On-Orbit Segment (USOS) Laboratory module ‘Destiny’ and Node 3 on the International Space Station (ISS). CDRA is housed in a standard ISS rack defined as the Atmosphere Revitalization (AR) rack consisting of the CDRA, Trace Contaminant Control Subassembly and Major Constituent Analyzer. The AR subsystem operation and failure detection are controlled automatically using software that has provisions for override control. This paper will present the blower failure that was experienced during AR rack level and Laboratory ECLS integrated testing. The failure description, failure investigation findings and steps taken to return CDRA to flight will be covered.
Technical Paper

Integrated Orbiter/International Space Station Air Quality Analysis for Post-Mission 2A.1 Risk Mitigation

2000-07-10
2000-01-2250
Crewmember ingress of the International Space Station (ISS) before that time accorded by the original ISS assembly sequence, and thus before the ISS capability to adequately control the levels of temperature, humidity, and carbon dioxide, poses significant impacts to ISS Environmental Control and Life Support (ECLS). Among the most significant considerations necessitated by early ingress are those associated with the capability of the Shuttle Transportation System (STS) Orbiter to control the aforementioned levels, the capability of the ISS to deliver the conditioned air among the ISS elements, and the definition and distribution of crewmember metabolic heat, carbon dioxide, and water vapor. Even under the assumption that all Orbiter and ISS elements would be operating as designed, condensation control and crewmember comfort were paramount issues preceding each of the ISS Missions 2A and 2A.1.
Technical Paper

The Boeing 777-300/PW4098 Flying Test-Bed Program

1998-09-28
985550
The 98,000 lb. thrust Pratt & Whitney PW4098 high-bypass turbofan engine recently completed a flying test-bed program on the Boeing 777-300 airplane. The purpose of the one-month program was to validate engine operability and to gather data that can be used for upcoming engine certification to the standards of Federal Aviation Regulations part 33. Testing included engine transient operation, steady-state performance, in-flight starting, component cooling, and inlet compatibility. When engine certification is complete, an airplane certification program will be conducted for the 777-300/PW4098, a combination of the world's largest twin engine airplane and the world's largest turbofan engine yet to fly.
X